1. Badge_Plans_Design_Service

    Step 2

    Simply send the completed form to [email protected], along with plans, sections and elevations in the formats listed, and any other additional information mentioned in the checklist.

  2. Badge Calendar

    Step 3

    We aim to respond to new enquiries within 20 working days. If you have a specific deadline in mind, please contact the Design Office at [email protected]

  3. Badge PDF Design Service

    Step 4

    When your designs are completed, we’ll send them to you in PDF or DWG format.

  4. Badge Folder Design Service

    Step 5

    Our internal system is updated and records kept on file, just in case any revisions are required.

Central Heating Developer Checklist

As part of the design process, a Developer Checklist will need to be completed. The target turnaround time for heating system designs is 20 working days from the receipt of suitably scaled final working drawings and a completed Developer Checklist. 

Any special request for the preparation of a design will need approval and be subject to the current demand.

The details and information you will need to be able to complete the Developer Checklist are listed below.

Diagram
  • Client & Site/Developer details
  • Drawing details
  • Housing Association specification
  • Design criteria (temps and “U” valves) including Refurbished Buildings and ASHP projects
  • System criteria (type of system manifold)
  • Zoning and Part L compliance requirements
  • Renewable requirements
  • Any other special requirements
  • Product details
    - Boilers
    - Radiators
    - Ancillary equipment