PRODUCT SAFETY NOTICE
Thermostat upgrade kit instructions
-
A thermostat upgrade is required to prevent a potential boiler overheat on certain boilers manufactured between August 2022 to 7th January 2024 across the boiler ranges listed below.
• LOGIC COMBI²
• LOGIC SYSTEM²
• LOGIC + COMBI²
• LOGIC + SYSTEM²
• LOGIC MAX COMBI²
• LOGIC MAX SYSTEM²
• IMINI²
• INDEPENDENT COMBI²
• KESTON COMBI²
• KESTON SYSTEM²